1. Determine the installation location and distance, clean the road surface, and ensure that the Raised Roadway Markers are installed on a flat road surface.
2. Clean the bottom of the Raised Roadway Markers and apply the epoxy glue evenly to the back of the studs.
3. Press the side with the glue on the road, fix the position, wait for the glue to dry.
4. Check within 2 hours of installation to ensure that all Raised Roadway Markers are not installed incorrectly and are not bent or deformed due to compression.
5. Remove the installation isolation facility within 6-8 hours after the installation of the Raised Roadway Markers.